PROJECT:
SECTOR:
Energy
VALUE:
  • £3.7M
CLIENT:
  • Hitachi Zosen Inova
KEY SERVICES:
  • Drylining, including ceilings
  • Raised access floors
  • All joinery works
  • Architectural balustrades
  • Office glass partitions
SCOPE:
  • 7 floors of CAT B fit out to the administration building of an Energy From Waste facility (EFW).
  • JPS delivered the fit-out services to all areas in close coordination with the Client and their directly appointed M&E installation contractor.
  • Working included the supply and management of the good hoist to serve the scoped works .
  • Works packaged included the air sealing and fire protection works to the scoped areas.