Main fit out of the building over the ground and 1st floor plus a number of additional works packages.
Client: Mitie FM – MOJ Contract
Category: Refurbishment & Fit Out
Date: Jan 2021 (project duration, 36 weeks)
Contract Value: £1.5 million
JPS Projects Ltd are proud to have secured repeat works for the MOJ on a project in Leeds having previously carried out a mixture of works on the buildings over the last 6 years.
Previous works have included but has not been limited to –
- Brickwork/Stonework repairs
- Electrical Works
- Refurbishment works
- Strip out works
In January 2021 JPS secured the main fit-out of the building over the ground and 1st floors and in addition have since secured a number of additional works packages ranging from LED lighting upgrade work across 5 floors, to flood defence works on the outside of the building.
The main and original works was originally circa 900k, with additional works taking it close to 1.5 Million.
The main ongoing works consists of the following work packages within a live building –